November 13, 2023
Host: Doug Walker
Secretary: Doug Walker
Attendees:
- Rémi Achard (TSC) - DNEG
Mark Boorer (TSC) - Industrial Light & Magic
Mei Chu (TSC) - Sony Pictures Imageworks
Sean Cooper (TSC ACES TAC Rep) - ARRI
Michael Dolan (TSC) - Epic Games
Patrick Hodoul (TSC) - Autodesk
- Zach Lewis (TSC) - Method
- Thomas Mansencal (TSC) - Weta FX
Carol Payne (TSC Chair) - Netflix
Mark Titchener (TSC) - Foundry
Carl Rand (TSC) - Weta Digital
Doug Walker (TSC Chief Architect) - Autodesk
Kevin Wheatley (TSC) - Framestore
- Mark Reid - Mark Reid VFX
Apologies:
- Carol Payne
- Michael Dolan
OCIO TSC Meeting Notes
- 2.3.1 release:
- As communicated previously, we plan on making a 2.3.1 bug-fix release. The currently anticipated time-frame for this is early to mid December.
- As communicated previously, we plan on making a 2.3.1 bug-fix release. The currently anticipated time-frame for this is early to mid December.
- Recap of annual presentation to the TAC:
- Carol and Doug made our annual health of the project update presentation to the ASWF TAC. It went well. The most notable item is our proposal to create a "Color Interop Forum" which would be a place to coordinate color management across various projects. The TAC liked this idea and so Carol and I will be giving this more thought and will plan a longer discussion a a future TSC meeting.
- Carol and Doug made our annual health of the project update presentation to the ASWF TAC. It went well. The most notable item is our proposal to create a "Color Interop Forum" which would be a place to coordinate color management across various projects. The TAC liked this idea and so Carol and I will be giving this more thought and will plan a longer discussion a a future TSC meeting.
- Open PRs to review:
- Doug reviewed the many open PRs (Four from Remi, one from Eric, one from Michael, and two from Doug) that are waiting for a second approval so they may be merged.
- Doug reviewed the many open PRs (Four from Remi, one from Eric, one from Michael, and two from Doug) that are waiting for a second approval so they may be merged.